ANALISA KINERJA WAKTU DENGAN BUILDING INFORMATION MODELLING (BIM) PADA PROYEK PASAR SOREANG KABUPATEN BANDUNG

Gunawan, Maulana (2022) ANALISA KINERJA WAKTU DENGAN BUILDING INFORMATION MODELLING (BIM) PADA PROYEK PASAR SOREANG KABUPATEN BANDUNG. Skripsi thesis, Universitas Muhammadiyah Sukabumi.

[img] Text
COVER.pdf

Download (104kB)
[img] Text
LEMBAR PENGESAHAN PEMBIMBING.pdf

Download (503kB)
[img] Text
HALAMAN PERNYATAAN PLAGIARISME.pdf

Download (446kB)
[img] Text
BAB I.pdf

Download (105kB)
[img] Text
BAB II.pdf
Restricted to Repository staff only

Download (931kB) | Request a copy
[img] Text
BAB III.pdf
Restricted to Repository staff only

Download (283kB) | Request a copy
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (6MB) | Request a copy
[img] Text
BAB V.pdf

Download (41kB)

Abstract

TIME PERFORMANCE ANALYSIS WITH BUILDING INFORMATION MODELLING (BIM) IN THE SOREANG MARKET PROJECT, BANDUNG REGENCY.. Maulana Gunawan. 1930125002. The application of BIM in the Soreang Market development project, Bandung Regency using the Tekla Structure application. How is the time performance in the implementation of the Pasar Soreang project, Bandung Regency. Applying BIM to 4-dimensional (4D) modeling in the construction of the Soreang market project in Bandung Regency. Analyzing project time performance in the form of deviation of realization weight with plan weight based on s curve. Research method is basically a scientific way to get data with a specific purpose and use. Based on the statement above, it can be seen that in a study using a method of processing data and drawing conclusions related to the problem in the study. District afternoon market project. Bandung uses Tekal Structure 19 software. With 3D modeling of buildings in the form of piles, pile caps, tie beams, columns, beams, plates and roof coverings. Then the schedule is added so that it becomes a 4D modeling using the task manager in the Tekla Structure application. In the 4D modeling obtained in the form of images that are able to present the work step by step according to the schedule. The importance of surveys related to traffic conditions around the project site in order to be able to engineer traffic flow so as not to hinder the mobilization of project materials.

Item Type: Thesis (Skripsi)
Uncontrolled Keywords: Time Performance, Building Information Modelling, Tekla
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Sains dan Teknologi > Teknik Sipil
Depositing User: Perpus ID UMMI
Date Deposited: 13 Oct 2022 03:23
Last Modified: 13 Oct 2022 03:23
URI: http://eprints.ummi.ac.id/id/eprint/2763

Actions (login required)

View Item View Item