ANALISA CONSTRUCTION WASTE MANAGEMENT (Studi Kasus : Proyek Pembangunan Aston Ciloto Puncak Hotel Resort - jalan Ciloto no.54 Cipanas, Kabupaten Cianjur, Jawa Barat)

Bahri, Rahmat Saepul (2021) ANALISA CONSTRUCTION WASTE MANAGEMENT (Studi Kasus : Proyek Pembangunan Aston Ciloto Puncak Hotel Resort - jalan Ciloto no.54 Cipanas, Kabupaten Cianjur, Jawa Barat). Skripsi thesis, Universitas Muhammadiyah Sukabumi.

[img] Text
COVER.pdf

Download (213kB)
[img] Text
LEMBAR PENGESAHAN PEMBIMBING.pdf

Download (583kB)
[img] Text
LEMBAR PERNYATAAN BEBAS PLAGIAT.pdf

Download (153kB)
[img] Text
BAB I.pdf

Download (310kB)
[img] Text
BAB II.pdf
Restricted to Repository staff only

Download (366kB) | Request a copy
[img] Text
BAB III.pdf
Restricted to Repository staff only

Download (353kB) | Request a copy
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (2MB) | Request a copy
[img] Text
BAB V.pdf

Download (193kB)

Abstract

Activities in the implementation of construction generate a lot of construction waste that has a negative impact on the surrounding environment and is also the biggest contributor to environmental damage that is one of the factors of the onset of construction waste. with one of the construction waste to realize green construction (environmentally friendly). This study aims to (1) to find out the type of construction waste of the Aston Ciloto Puncak Hotel Resort Development Project (2) to find out the cause of construction waste (3) to know the effectiveness of Waste Management to realize Green Construction (4) to know that the importance of Green Construction This research uses a descriptive qualitative method. The study samples used purvosive sampling method. The person who will be the source is the contractor who handles the construction project of Aston Ciloto Hotel Resort. this study knows the effectiveness of contractors in construction waste management efforts and also to find out the causes of construction waste. The result of this study is (1) the type of constructural waste from the 3 buildings is dominated by solid waste and for gas waste and search is almost invisible or little. (2) The cause of construction waste in the 3 buildings is caused by design changes that become one of the highest factors resulting in construction waste with an index of 0.014. (3) Assessment of Waste Management Peformance Evaluation Tools (WMPET) shows that construction waste management in the 3rd development is very effective to reduce construction waste. The value of effectiveness obtained is 715.00 or 71.50% of 1000.

Item Type: Thesis (Skripsi)
Uncontrolled Keywords: construction waste, Green construction, Waste Management
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Sains dan Teknologi > Teknik Sipil
Depositing User: Fuji Amalia
Date Deposited: 05 Aug 2021 01:35
Last Modified: 05 Aug 2021 01:35
URI: http://eprints.ummi.ac.id/id/eprint/1855

Actions (login required)

View Item View Item