Febrizal, Dhika and Kartika, Nia (2023) IDENTIFIKASI BAHAYA PERENCANAAN PROYEK RENOVASI GEDUNG HOTEL HORISON EXPRESS FATMAWATI JAKARTA. Jurnal Talenta Sipil, 6 (1). pp. 38-43. ISSN 2615-1634
![]() |
Text
143 Download (25kB) |
Abstract
The implementation of construction development is an activity that causes many elements of danger, so it has a risk of work accidents. Factors that cause work accidents, ranging from a lack of employee discipline in maintaining occupational health and safety. This identification aims to assess the risks in the Planning of the Horison Express Hotel Building Renovation Fatmawati Jakarta, using a questionnaire with a frequency value (F) and a severity value (A), the results of the identification of the IBPRP method there are work items with a moderate level of risk in the Lt. 1-4 the relative risk value is obtained with a value of 9 (medium), and the work with a high level of risk is in the Lt. Structural Work. 5-6 relative risk values obtained Value of 20 (High), the results of the identification there are 58 basic events that cause the basic risk of 26 items of work, obtained a presentation of the value of low risk level of: 50%, moderate risk level of: 46.5%, and high risk level of: 3.5%. For hazard identification methods other than using the IBPRP method, can use other hazard identification methods for research on the same theme.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Risk Identification; Frequensy Rate; Severety; Risk Level |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Sains dan Teknologi > Teknik Sipil |
Depositing User: | Perpus ID UMMI |
Date Deposited: | 20 Feb 2023 02:45 |
Last Modified: | 20 Feb 2023 02:45 |
URI: | http://eprints.ummi.ac.id/id/eprint/3036 |
Actions (login required)
![]() |
View Item |